Project Completion: 11kV installation in Solihull
12.11.2017
Scope of Works- Installation of 11KV cable for network reinforcement and new LV cable for replacement of existing Consac main.
The 1.2 km route incorporated carriageway, footpath and verge on ‘A’ Roads, busy residential areas with numerous driveway crossings and quieter residential streets.
A working supervisor liaising with the client and highway authority alongside dedicated reinstatement teams on site meant all access was maintained minimising the effect for traffic and residents. The scheme was completed within schedule despite additional work requested by WPD after excavation works had begun.